City of Lyndhurst News Article Header

 

 

Richmond Road Concrete Repair Project

Construction Underway
Construction Completion: October 27th 2021 Calendar event icon.

Construction notice. Three orange and white construction barriers in a row.

Released: 10/13/2021

Richmond Road will be under construction between Meadow Wood Blvd and Mayfield Road from August 16th 2021 Calendar event icon. to October 27th 2021 Calendar event icon..

The contractor will be replacing concrete pavement in this area.

The project is being administered by ODOT, please contact D12.Public.Information@dot.ohio.gov ✉ or (216) 584-2005 ☎ or the City Engineer, Jeff Filarski, filarski@cvelimited.com ✉ or (440) 399-0810 ☎ with any questions.

Traffic will be reduced to one lane in each direction during the project.

Thank you for your patience and assistance as we work to complete these repairs.

Construction map.
Released: 8/8/2021

Richmond Road will be under construction between Meadow Wood Blvd and Mayfield Road from August 16th 2021 to September 30th 2021.

The contractor will be replacing concrete pavement in this area.

The project is being administered by ODOT, please contact D12.Public.Information@dot.ohio.gov ✉ or (216) 584-2005 ☎ or the City Engineer, Jeff Filarski, filarski@cvelimited.com ✉ or (440) 399-0810 ☎ with any questions.

Traffic will be reduced to one lane in each direction during the project.

Thank you for your patience and assistance as we work to complete these repairs.

Construction map.
Released: 1/28/2021

Richmond Road (S.R. 175) Concrete Repair Project

➜ The City of Lyndhurst, working in cooperation with the Ohio Department of Transportation (ODOT), will be performing concrete pavement repairs on Richmond Road (S.R. 175) between Meadow Wood Boulevard to Mayfield Road (U.S. 322). CUY-S.R. 175-07.97 (Richmond Road) - PID 114329 is being coordinated by ODOT. The project will consist of removing, undercutting, and replacing deteriorated concrete pavement and joints. These improvements will extend the lifetime of the roadway and improve rideability. The project will also include upgrades to curb ramps at the intersections of Richmond Road-Clubside Road, Richmond Road-Bristol Court, Richmond Road-Haverford Road, and Richmond Road-Oakmont Drive for increased handicap mobility.

➜ Traffic on Richmond Road (S.R. 175) will be maintained in both directions during all phases of construction. Phase 1 of construction will maintain one northbound and one southbound lane of traffic as the pavement is replaced in both curb lanes. Phase 2 will flip the construction zone and traveling public lanes. Phase 2 will maintain one northbound lane and one southbound lane on both the curb lanes. Construction will take place in the two inner lanes during Phase 2. All intersections will remain open and residents who live on Richmond Road will be given access to their houses.

➜ Project Schedule:

• Design Complete - February 2021
• Project Award - May 2021
• Construction Begin - August 2021
• Construction Completion - October 2021

➜ Estimated Construction Cost:

• $700,355.00 - 80% is funded by ODOT

➜ Project Funding Sources:

• ODOT Urban Paving Funds

➜ Representative:

• Lyndhurst Ward 4 - Stephen C. Grushetsky Sr.

➜ Public Input:

The City of Lyndhurst is seeking public input regarding this project. Comments may be sent to:

Jeff Filarski, City Engineer
22999 Forbes Road, Suite B
Oakwood Village, Ohio 44146
Google Maps icon.

By phone at (440) 399-0810 ☎ or email via email to filarski@cvelimited.com ✉.

Comments will be received until February 28, 2021.

Thank you.


 

Information provided by: The City of Lyndhurst, Ohio
5301 Mayfield Road, Lyndhurst, Ohio 44124  Google Maps icon.
Phone: (440) 442-5777 ☎ | Fax: (440) 442-1844
https://www.lyndhurstohio.gov/  🌐